Fees you pay AACE directly (no provider can waive these)
| AACE fee | Amount |
|---|---|
| Exam fee — member | $525 |
| Exam fee — non-member | $690 |
| Resit fee (up to 2 within your 6-month registration) | $260 each |
The membership maths is simple: joining AACE reduces the exam fee by $165 and discounts study materials — so membership frequently pays for itself at exam time. Check current membership pricing on AACE's site for your category and country.
Training: the cost driver you actually control
| Option | Cost | Format |
|---|---|---|
| Classroom bootcamps (typical market) | $2,000+ | Fixed dates, often travel |
| CCP Complete Self-Paced Preparation (self-paced) | $590 | 180 days, 24/7, all-inclusive |
| Self-study with AACE books only | $100–$300 | No structure, no simulations |
Pure self-study looks cheapest until you price the risk: without full-length simulations and memo practice, first-attempt failure means a $260 resit, weeks of lost time, and often a course purchase anyway. Structured self-paced prep at $590 — including 3 timed 120-question simulations and Domain 7 memo training — is the value sweet spot for most candidates. Not sure you qualify yet? Check the CCP eligibility requirements first.
Optional reference materials (AACE list prices)
- CCP Certification Study Guide — $50 member / $100 non-member
- Skills & Knowledge of Cost Engineering, 6th Edition — $50 member / $150 non-member
- Recommended Practices 11R-88 and 10S-90 — free for members
- How to Write a CCP Memo — free download from AACE
Three realistic budget scenarios
| Scenario | Total |
|---|---|
| Self-paced prep + member exam fee | $1,115 + membership |
| Self-paced prep + non-member fee | $1,280 |
| Instructor-led course + member fee | $2,725+ |
One more line many candidates forget: employer sponsorship. Cost certifications map directly to project performance, and training budgets in construction/EPC routinely cover AACE credentials — a one-page business case citing the role requirement is often all it takes. See our 12-week CCP study plan to budget your prep time alongside the investment. Full course details: see what $590 includes.
Frequently asked questions
Are there hidden fees in the CCP process?+
Does the $590 course have a subscription or renewal?+
Is the exam fee refundable if I'm found ineligible?+
Can I pay for the exam in my local currency?+
Prepare with an AACE-Approved Provider
2026-blueprint study guide, video lessons, 3 full-length simulations, memo mastery — $590, 180 days.
Sources: AACE International CCP Candidate Handbook (rev. June 2026) and AACE's official CCP certification pages. CCP® is a registered mark of AACE International. More CCP articles →
