Updated for the 2026 CCP® Exam Blueprint
3FOLD Training — AACE-Approved CCP Exam Prep
AACE International — Approved Education Provider

CCP® Certification Training — pass without guesswork.

One complete program built for the 2026 exam blueprint: video lessons, 3 full-length simulations, and in-exam memo mastery — trusted by 1,600+ cost professionals worldwide.

AACE Approved ProviderOpen to Worldwide StudentsSelf-Paced, No ScheduleSecure LMS Access
Not sure you qualify? Take the 30-second eligibility check →
AACE-Approved Education ProviderAligned to the 2026 exam blueprint1,600+ students enrolled100% online, self-paced LMS
Why professionals choose CCPStudy

Everything you need to pass

The CCP® exam combines 119 technical questions across 7 domains with a written memo. Most candidates fail on structure, not knowledge. Our program fixes both — including real CCP practice exam questions.

Built for the 2026 Blueprint

AACE rebuilt the CCP exam around a new weighted blueprint in May 2026. Our study guide and lessons are already restructured to match — so you study what the exam actually tests.

Domain-Wise Video Lessons

On-demand video lessons mapped to the exam domains and keyed to AACE's “Skills & Knowledge of Cost Engineering” (6th Edition) — from cost estimation and cost control to scheduling and contracting.

3 Full-Length Simulations

Three timed, 120-question exam simulations — 5 hours each, just like the real thing — with a results page showing every correct and wrong answer, plus a downloadable formula sheet.

Memo Writing Mastery

Domain 7 of the exam is a written memo — and it trips up more candidates than any question. Get step-by-step memo guidelines plus 3 real sample memos.

180 Days, Study Anywhere

Six months of 24/7 access matches AACE's exam registration window. Our LMS works on any device, any timezone — no fixed class timings, ever.

Exceptional Value

CCP Complete Self-Paced Preparation is $590, one-time — exam-focused preparation from an AACE-Approved Provider.

About the certification

What is the AACE CCP Certification?

The Certified Cost Professional (CCP®) is the most respected credential in cost engineering, cost management, and project controls — awarded by AACE International.

The Certified Cost Professional (CCP®) credential, issued by AACE International, is the benchmark certification for professionals in cost engineering, project controls, estimating, scheduling, and earned value management. It is your gateway to senior project controls and cost management roles across construction, oil & gas, infrastructure, mining, and EPC sectors worldwide.

Preparing for the CCP exam demands deep knowledge of the Total Cost Management Framework (TCM), AACE Recommended Practices, cost estimating methodologies, schedule analysis, and risk management. Our program covers every testable topic with structured, expert-authored content mapped to the 2026 exam blueprint.

Who awards the CCP?

The CCP® is issued by AACE International — the Association for the Advancement of Cost Engineering, the world's leading authority in cost engineering, founded in 1956 and headquartered in Morgantown, West Virginia, USA. 3FOLD Training is an AACE Approved Education Provider (AEP) for 2026.

Cost Engineering

Master cost estimating, budgeting, cost control, and variance analysis — core CCP exam topics.

Project Controls

Earned Value Management (EVM), scheduling, WBS, progress measurement and reporting.

Risk & Claims

Risk quantification, contingency determination, change management, and claims analysis.

Global Recognition

Recognized by employers worldwide — essential for cost managers in the US, UK, Middle East & Australia.

Free 30-second check

Am I eligible for the CCP® exam?

Answer 4 quick questions to see where you stand against AACE International's eligibility requirement — before you spend anything.

  • 8 years of industry-related experience, or
  • 4 years of experience + a 4-year industry-related degree
  • Experience must be verified by your employer

Want the detail? Read the full CCP eligibility guide →

1 / 4

How many years of industry-related work experience do you have?

Count roles in cost, estimating, planning, project controls, QS, contracts or project management.

One program. Everything included.

CCP Complete Self-Paced Preparation

No tiers, no upsells, no “premium” add-ons. One plan with everything you need, from first lesson to exam day.

All-Inclusive · 2026 Blueprint Ready

CCP Complete Self-Paced Preparation

One enrolment covers everything — from your first lesson to your AACE application.

What you get

  1. 1.Learn every domain

    2026-blueprint study guide + 40 on-demand video lessons, from the Foundations module through all six scored domains.

  2. 2.Practice like it's the real exam

    3 full-length mock exams (120 questions, 5 hours) + 6 domain practice tests at exam weights, with results breakdowns.

  3. 3.Master the memo

    Step-by-step memo writing guide with 3 real model samples for the graded Communication task.

  4. 4.Get certified with support

    Formula sheet & terminology glossary, AACE application support, and a completion certificate verifiable in our registry.

$590

one-time payment · no subscription

  • 180 days of 24/7 access
  • 100% self-paced — no schedule
  • All domains + memo covered
  • Aligned to the May 2026 blueprint

Secure card payment via Telr — your details are never stored by us.

See full course curriculum & modules → · View the 12-week CCP study plan →

Is this you?

Who Should Earn the CCP?

The CCP is pursued globally by professionals across construction, energy, EPC, and infrastructure. If your role touches cost or controls — this is for you.

Cost Engineers

Validate your expertise in cost estimating, control, and reporting on capital projects worldwide.

Project Controls Professionals

Advance your career in earned value management, schedule analysis, and project performance reporting.

Oil & Gas Professionals

The CCP is a preferred credential in upstream, midstream, and downstream project cost functions globally.

Quantity Surveyors

Add AACE CCP to your QS or PQS credentials for international recognition beyond the Commonwealth.

EPC & Construction Managers

Valued by leading EPC contractors. Stand out in bids for large capital infrastructure programs.

International Professionals

The CCP travels with you — across the US, Middle East, Australia, Canada, UK, and Asia.

Our self-paced online format means you can study and earn your AACE CCP certification regardless of where you're based — the LMS is fully accessible worldwide, 24/7.

Your path to CCP®

From Enrolment to Certified

Four simple steps — start today, study at your pace, sit the AACE CCP exam when ready.

01

Enrol Online

Check your eligibility (free, via our advisors), then pay securely online by card. Your enrolment is confirmed on payment.

02

Access Your LMS

Get access to your full course content — the 2026-blueprint study guide, video lessons, practice questions, and simulations.

03

Study at Your Pace

No schedule, no deadlines. Study when and where you want — on desktop, iOS, or Android — and practice with three full-length simulations.

04

Sit the AACE Exam

Register directly with AACE International and sit your CCP exam at a test center or via online proctoring. Our preparation gives you the edge to pass. (Note: AACE paused CCP exam delivery from Jul 8 – Oct 1, 2026 for an integrity review — applications reopen Sep 17, 2026. Enrolling and studying with us isn't affected.)

1,600+professionals enrolled
3full-length exam simulations
180days of 24/7 access
100%online & self-paced
Student results

Certified professionals. Real reviews.

“The best place to get courses. The instructor makes you understand how to pass the exam, how cost control works technically and how to apply it in the field. Ms. Alegria, the coordinator, takes you from the beginning of your journey until you pass.”

AF
Abdelrahman FadlCertified Cost Professional

“I had the CCP preparation course with 3FOLD. A well-designed course that fits the needs to pass the CCP exam. The staff is very friendly, supportive and cooperative as well.”

OE
Omer ElshiekhCertified Cost Professional

“Outstandingly structured lectures and study materials helped me very much to obtain my CCP. 3FOLD Training is highly recommended. A+++”

AD
ADJCertified Cost Professional

“I've got my CCP certification using the CCP course from 3FOLD. It was really helpful. Thank you!”

SY
Samuel YonathanCertified Cost Professional

Read all 24 real Google reviews from CCP students →

Know the exam

What is the CCP® certification exam?

Quick answer: The AACE Certified Cost Professional (CCP®) exam is a closed-book exam of up to 5 hours with 119 multiple-choice questions plus one written memo, scored across 7 domains under the 2026 blueprint. You need a 70% overall average to pass. Eligibility requires 8 years of industry experience, or 4 years plus a related 4-year degree.

The CCP® is the flagship credential of AACE International for cost engineering and total cost management — recognized across construction, oil & gas, EPC, infrastructure, and energy megaprojects worldwide. See the full domain breakdown in our CCP exam syllabus guide.

Read the complete CCP guide →
Questions119 MCQs + 1 written memo
DurationUp to 5 hours
Passing score70% overall average (7 domains)
FormatClosed book · on-screen formula sheets · calculator permitted
DeliveryTest center or online proctoring
AACE exam fee$525 member / $690 non-member
Resits$260 · up to 2 within registration period
Current status (Sep 2026)AACE paused CCP exam delivery Jul 8 – Oct 1, 2026 for an integrity review; applications reopen Sep 17, 2026
Who we are

Why Train with 3FOLD?

3FOLD Training is a globally recognized professional certification training provider — established 2008 in Dubai, UAE, and trusted by over 1,600 CCP candidates.

  • AACE Approved Education Provider

    3FOLD is an officially approved AEP for AACE International — the issuing body of the CCP credential — for 2026. Our content meets AACE's quality standards.

  • World's First LMS-Based CCP Prep

    We pioneered the delivery of CCP exam preparation through a full learning management system — making structured, expert preparation accessible globally.

  • Expert-Authored Content

    All study materials, practice questions, and simulations are created by experienced AACE-certified professionals and cost engineering practitioners with real project experience.

  • Mobile-First LMS Experience

    Study on any device — iOS, Android, or desktop. Our LMS is fully optimized for mobile, so you can prepare during commutes, travel, or downtime.

  • Secure Payments & Trusted Platform

    Pay by credit or debit card through our secured gateway. No card data is stored. Backed by a clear refund and cancellation policy.

Our 2026 AACE AEP certificate — verify on AACE

3FOLD Training

Established 2008 · Dubai, UAE. Trusted by 1,600+ CCP candidates, 1,000+ ISO Lead Auditor students, and professionals worldwide. Headquartered at Dubai Silicon Oasis with operations in India and online globally.

More about us →
Common questions

CCP exam prep — frequently asked questions

What is the AACE CCP exam format in 2026?+
Under the 2026 blueprint, the CCP exam has 119 simple and scenario multiple-choice questions plus 1 written memo, taken in up to 5 hours. It's closed book with on-screen formula sheets provided; any battery-operated calculator is allowed. You need a 70% overall average across the 7 domains to pass.
Is your course updated for the new 2026 exam blueprint?+
Yes. AACE restructured the CCP exam under the May 2026 blueprint — six weighted scored domains plus the Communication memo — and our study guide, lessons, and simulations are aligned to it — including the Domain 7 memo task.
Is 3FOLD really approved by AACE International?+
Yes. 3FOLD Training is an AACE International Approved Education Provider (AEP) for CCP preparation. You can verify our listing directly on AACE's official AEP directory.
Am I eligible for the CCP certification?+
AACE requires 8 years of industry-related experience, or 4 years of experience plus a 4-year industry-related degree. Experience must be verified by your employer (a CV alone is not accepted). There is no technical paper requirement under the current process.
How long do I get access?+
CCP Complete Self-Paced Preparation includes 180 days (6 months) of 24/7 access — deliberately matching AACE's 6-month exam registration period. The program is fully self-paced — study whenever suits you.
Is payment secure?+
Checkout runs through Telr, a PCI-DSS compliant payment gateway, with credit and debit cards. Your card details are never stored by us. If online payment isn't possible where you are, contact us and we'll arrange an alternative payment method.

See all FAQs → · Browse all CCP articles →

Your CCP® journey starts today

Join 1,600+ professionals who prepared with an AACE-Approved Education Provider. 100% self-paced. 180 days. Study on your schedule.

WhatsAppEnrol — $590